Dirección: A-No.8 Xifei RD, Jiufu Develop Zone, Songjiang District, Shanghai, PRC
Tel: 400-021-1909(Free)
86-21-64611549
86-21-64196220
86-21-51873688*(851)
Fax: 86-21-67690924
86-21-67627805
E-mail: info@lupacking.com
Código: 201615
Click here for more information of steel tube packaging machine
Automatic steel tube bagging machine, Stainless steel tube packaging line
Discussing Statistics 1 and 2, metallic tube packing device from the present invention, includes a base 1, the first 4 bundled triangular bracket 2, the handle 4 and also the 4 2nd load of several triangle bracket 3, the repaired rod 4 is set to a small grouping of two stops of your basic I, and also the sq . submission package are attached to the several 2nd aspect of your help body 3 of your correct direction using a repaired rod 4 activity, and might be secured throughout the rod 4 costs nothing to spin, and the other side at correct angles on the side area from the direction; first package is a collection of two supporting body 2 is set in the foundation I, also rectangular distribution, each of the a number of very first packaging the right position bracket 2 I resolved aspect and resolved bottom, and the two from the very same group resolved parallel to each other at correct perspectives towards the first manufactured bracket two edges or on the same right series, two hypotenuse reverse, two various teams of the first package of support body 2 parallel to one another at proper facets aside. I aspect of your basic is provided with a plurality of bundles of rods 5, 5 along the bottom of the rod pack about the same side I consistently spread out. Established on the lashing rod 5 has strapped up with six, tied with half a dozen to 1 conclusion in the interconnection. I the rear side of the base 7 is supplied by using a shutter, the shutter 7 resolved on the help framework parallel on the initially load 2 area at proper perspectives. I is definitely the basic structure. According to the second pack, hexagonal steel tube bundle if needed, then I make the same side of the base support frame formed by combining four packed hexagonal; If you need trapezoidal steel bundle, then the second pack 3 Adjust the bracket to the other direction, when packaged, the demand for 3-position adjustment bracket. Bundled with 6 - conclusion on the lashing rod 5, other stop of your initial assist framework 2 is packed in the airplane parallel to the foundation I located the framework, if the model of the metallic bracket combinations neatly, use the water pipe package baffle 7 stop Quqi, tied with 6 turning round the tubing along with the other end attached to one week to finish the bundle.